MULTIEMPLOYER WORK SITES DEFINED by OSHA Four categories of employers______ employer.______ employer. ______ employer. ______ employer.
查看答案
No-damages-for-delay clauses (NDD) Limited to an EOT but no cost adjustment EVEN in instances where the owner’s acts or failure to act (An ______ clause) Judicial attitudes on NDD: mixed
Which one of the following items is NOT an element for the establishment of type I (one) differing site condition (DSC).
A. Two geological conditions on the same site are generically different.
B. The contract documents must be specific about the geological condition.
C. The actual condition materially differs from the condition stipulated in the contract.
Which of the following item(s) is INCORRECT about insurance?
Additional parties are sometimes named as “additional named insureds.”
B. Worker’s compensation and employer’s liability insurance contract assume the liability imposed on the insured contractor employer when an employee is injured or killed.
C. Insurance premium rate modifiers of worker’s compensation policies are normally based on the financial capability of GC.
D. Flat premium payment for the duration of the project (for builder’s risk insurance) is the prevalent method in use in the industry.
Which one is NOT common exclusions of the public liability policies of an insurance contract?
A. On-site operations.
B. Explosions.
C. Structural Collapse.
D. Underground utilities.