Which of the following item is NOT the “nature” of the construction industry?
A. Fragmented responsibility among stakeholders.
B. Dangerous during construction.
Climate / weather is a critical performance factor.
D. The majority of tasks are highly repetitive.
查看答案
Which of the following is INCORRECT about the stakeholders?
A. Normally, a GC coordinates most of the construction work.
B. Stakeholders’ considerations are different.
C. An architect-engineer always conduct in-house design rather than subcontract to special consultants.
D. A broker contractor means the contractor who outsource most of the construction work except supervision, coordination, and management.
The delivery mode of the abovementioned project is similar to _______________
A. Integrated Project Delivery (IPD)
B. Engineering-Procurement-Construction
C. Design-Build-Operate-Maintain (DBOM)
Design-Bid-Build (DBB)
Which of the following item is CORRECT?
A. Seasonality is not a risk source to construction.
B. Local condition is one of the major risk source that makes mgmt. procedure difficult to be implemented.
C. Most of the stakeholders in construction are fast in applying management procedures.
D. Employee turnover is low in construction.
In general, ________ desires fixed price contracts rather than cost reimbursable contracts.
A. The owner
B. No one
C. The contractor