Inputs to quality control include all of the following EXCEPT ().
A. work performance information
B. quality management plan
C. quality checklists
D. PERT chart
查看答案
When should scope verification be done ?()
At the end of the project
B. At the beginning of the project
C. During each phase of the project
During planning
福莱特对于执行好领导应有的三大功能、成为一个有效的领导而提出的建议不包括( )
A. 要吃透本职工作
B. 要学会把握全局
C. 要懂得创权、用权
D. 要克服冒险精神
堤基清理的要求中,堤基清理范围包括堤身、铺盖和压载的基面,堤基清理边线应比设计基面边线宽出( ) cm。
A. 10~15
B. 20~30
C. 30~50
D. 50~80
An output of scope definition is ().
A. work breakdown structure (WBS)
B. resource breakdown structure (RBS)
C. project scope statement
D. schedule delays control plan