题目内容

All of the following is true for a project baseline EXCEPT ().

A. it is the original approved plan
B. it includes approved scope changes
C. it is useful in detecting project variances
D. it is useful in preparing the WBS

查看答案
更多问题

在巴纳德看来,组织的存在取决于( )

A. 协作系统平衡的维持
B. 组织成员的责任一致
C. 组织的需求
D. 协作系统的失衡

Quality control should be performed ().

A. when the product of the project is completed to ensure that no defects exist
B. throughout the project life cycle
C. during the closeout phase but before final acceptance by the customer
D. as desired by the quality assurance department

激活菜单栏的快捷键是( )。

A) F10
B) F4
C) F5
D) Ctrl

Your technical team leader, Ted, proposed an action that would overall project quality with a minor cost increase. The project control officer, Sun Ha, recommended an approach that would shorten the project schedule, but reduce product features. Increasing quality and accelerating the schedule are critical form your point of view. Although you believe that Ted and Sun Ha could learn from each other, they typically like to agree to disagree. You need a conflict resolution method that provides a long-term resolution. You decide to use which one of the following approaches ?()

A. Confronting
B. Problem solving
Compromise
D. Smoothing

答案查题题库