Which one of the following items is NOT an official reason for denying differing site condition claims issued by a general contractor?
A lack of notice to the owner regarding the differing site condition.
B. A bad relationship with the government.
C. A difference between the site condition and the drawing is not material.
D. The GC fails to conduct an adequate pre-bid site inspection.
查看答案
Referring to the previous lecture, please fill the blanks of the services provided by the architect-engineer: • Analyzing a ______ the needs of the owner. • ______ a design that will meet the owner's needs within the owner’s budget. • Preparing the contract and bid documents for the project. • ______ the owner in the selection of a contractor. • ______ the interests of the owner during the construction process.
According to our discussion, the approximate cost estimation coefficient and approach should be as follows. Light:______ (quantity unit); ______ estimate Drop ceiling: ______ (quantity unit); ______ estimate Tiles: ______ (quantity unit); ______ estimate Kitchen cabinet: ______ (quantity unit); ______ estimate
Notice Requirements (NR): Necessary? The contractor notify the government promptly when encountering DSC ______ the conditions are disturbed Lack of notice (LoN) can be fatal to a DSC because (LoN) can ______ the rights of the government by denying / precluding the opportunities to 1) verify a DSC; 2) direct course of action.
An Example: Clause 1(DSC): additional compensation for DSC Clause 2(Disclaimer): the subs ______ on the boring logs Court: DSC takes precedence