The track equipment includes:steel track, ____________, a sleeper,____________,____________,and connecting parts.
For the power supply system, ____________ has been adopted as the mode of providing direct current for the contact rail(the third rail).
The ________ and the ________ are the foundation (基础)ofthe steel track.
Theexpression “railroadtrack”isusedinBritishEnglish.
A. 对
B. 错