Pitch is produced by frequency of vibration of the vocal cords. The higher the frequency, the higher the pitch.()
查看答案
新拌混凝土的工作性,就是拌和物的流动性。
A. 对
B. 错
评定采用的回弹弯沉值是指标准后轴双轮隙中心处的最大回弹变形值。
A. 对
B. 错
The back-chaining technique means the students repeat a sentence after the teacher, starting from the end part of the sentence and moving towards the beginning.()
A. 对
B. 错