Where does the conversation happen
A. In the Bank of China.
B. In a taxi.
C. In a hotel.
查看答案
实施监理的工程,建设单位委托监理单位承担施工阶段和工程质量保修期的监理工作,建设单位与施工单位按《建设工程施工合同》(示范文本)签订了施工合同。基坑支护施工中,项目监理机构发现施工单位采用了一项新技术,未按已批准的施工技术方案施工。项目监理机构认为本工程使用该项新技术存在安全隐患,总监理工程师下达了“工程暂停令”,同时报告了建设单位。施工单位认为该项新技术通过了有关部门的鉴定,不会发生安全问题,仍继续施工。于是项目监理机构报告了建设行政主管部门。施工单位在建设行政主管部门干预下才暂停了施工。施工单位复工后,就此事引起的损失向项目监理机构提出索赔。建设单位也认为项目监理机构“小题大做”,致使工程延期,要求监理单位对此事承担相应责任。该工程施工完成后,施工单位按竣工验收有关规定,向建设单位提交了竣工验收报告。建设单位未及时验收,到施工单位提交竣工验收报告后第45天时发生台风,致使工程已安装的门窗玻璃部分损坏。建设单位要求施工单位对损坏的门窗玻璃进行无偿修复,施工单位不同意无偿修复。 对施工单位采用新的基坑支护施工方案,项目监理机构还应做哪些工作。
Art exhibition: More than one hundred art works about American life are showing now. All the works are from Chinese who live in America. They use their brushes and pencils to draw what they have seen and experienced in America. All the works are spoken very high, and some of them have won prizes in International matches. Time: 8:00 a.m.~8:00 p.m., the first week of July. Place: International Exhibition Center Telephone: 67937284 Australian dance: The Australian Dance Company, one of the best dance group in the world, is going to give shows in five cities around China: Beijing, Shanghai, Guangzhou, Chengdu and Nanjing. The names of their show are "Search for the Sun" and "The Dance of Sea" The dancers are all famous ones, for example, Patricia Ella, first of the Australian dancing match, Louis Jackson and Lily Wang. The dancing group will give three shows at the Renming Theatre. Time: 7: 30pm, July 24~26 Place: Renming Theatre, 40 Renming Road, Beijing Telephone: 65534988 Where can you go to see the Australian dance
A. International Exhibition Center
B. Renming Theater.
C. Doesn’t say.
The Big Ben (英国大本钟) is located in the tower in London. It is very famous (41) the world, but nobody really knows why it is (42) Big Ben. There are two stories (43) this. Some people say that it was named (44) Benjamin Caunt, a boxer. People called (45) Big Ben. But more people believe it was called after Welshman, Sir Benjamin Hall. He was in (46) of this work in 1859. A story was told that during a (47) in a meeting on what (48) the bell, Sir Benjamin was going to give his ideas when an officer behind him shouted (49) , "Let’s call it Big Ben!" From (50) on it was named Big Ben.
A. throughout
B. over
C. at
某工程项目,经有关部门批准采取公开招标的方式确定了中标单位并签订合同。 该工程合同条款中部分规定如下:(1)由于设计未完成,承包范围内待实施的工程虽然性质明确,但工程量还难以确定,双方商定拟采用总价合同形式签订施工合同,以减少双方的风险。(2)施工单位按建设单位代表批准的施工组织设计(或施工方案)组织施工,施工单位不承担因此引起的工期延误和费用增加的责任。(3)建设单位向施工单位提供场地的工程地质和地下主要管网线路资料,供施工单位参考使用。(4)施工单位不能将工程转包,但允许分包,也允许分包单位将分包的工程再次分包给其他施工单位。在施工招标文件中,按工期定额计算,该工程工期为573天。但在施工合同中,双方约定:开工日期为2008年12月15日,竣工日期为2010年7月25日,日历天数为586天。在工程实际实施过程中,出现了下列情况:工程进行到第6个月时,国务院有关部门发出通知,指令压缩国家基建投资,要求某些建设项目暂停施工。该工程项目属于指令停工下马项目,因此,业主向承包商提出暂时中止合同实施的通知。承包商按要求暂停施工。复工后在工程后期,工地遭遇当地百年罕见的台风的袭击,工程被迫暂停施工,部分已完工程受损,现场场地遭到破坏,最终使工期拖延了2个月。 该工程合同条款中约定的总价合同形成是否恰当并说明原因。