Developing reliable software on time and within (31) represents a difficult endeavor for many organizations. Usually business solutions have three main aspects:people, (32) , and technology. The main reason for failing software projects has little to do with technology and tools, and much to do with lack of process (33) . Experience has shown that introducing new technology and tools in an immature or undisciplined environment is likely to increase the chaos. CASE tools are not enough. "A fool with a tool is still a fool" Structured method was the first wave of the software industry. This was the beginning of transforming software development from a" (34) industry’ to mass production. Software process movement if the second wave in the software industry. The process maturity movement prepares the way for the third wave of the software industry: "software industrialization". Software development will become like an assembly and manufacturing process. A critical enabling factor is a disciplined software engineering process with predictable quality, (35) and functionality.

A. process
B. skill
C. organization
D. interface

查看答案
更多问题

Developing reliable software on time and within (31) represents a difficult endeavor for many organizations. Usually business solutions have three main aspects:people, (32) , and technology. The main reason for failing software projects has little to do with technology and tools, and much to do with lack of process (33) . Experience has shown that introducing new technology and tools in an immature or undisciplined environment is likely to increase the chaos. CASE tools are not enough. "A fool with a tool is still a fool" Structured method was the first wave of the software industry. This was the beginning of transforming software development from a" (34) industry’ to mass production. Software process movement if the second wave in the software industry. The process maturity movement prepares the way for the third wave of the software industry: "software industrialization". Software development will become like an assembly and manufacturing process. A critical enabling factor is a disciplined software engineering process with predictable quality, (35) and functionality.

A. law
B. discipline
C. plan
D. evaluation

Activity Based Costing (ABC) is an (36) technique that allows an organization to determine the actual (37) associated with each product and service produced by the organization without regard to the organizational structure. This chapter explains some of the uses and benefits of Activity Based Costing. We use IDEFO (38) modeling in conjunction with ABC to enable more effective business (39) design decisions. In order to achieve the major goals of business process improvement, process simplification and improvement, FAA managers need to fully understand the cost, time, and quality of activities performed by employees or machines throughout an entire organization. ABC methods enable (40) to cost out measurements to business simplification and process improvement.

A. computing
B. campaigning
C. programming
D. accounting

Activity Based Costing (ABC) is an (36) technique that allows an organization to determine the actual (37) associated with each product and service produced by the organization without regard to the organizational structure. This chapter explains some of the uses and benefits of Activity Based Costing. We use IDEFO (38) modeling in conjunction with ABC to enable more effective business (39) design decisions. In order to achieve the major goals of business process improvement, process simplification and improvement, FAA managers need to fully understand the cost, time, and quality of activities performed by employees or machines throughout an entire organization. ABC methods enable (40) to cost out measurements to business simplification and process improvement.

A. activity
B. quality
C. cost
D. process

Project (24) Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.

A. Integration
B. Scope
Configuration
D. Requirement