题目内容

The Empire State Building, the world"s tallest for four decades and still the tallest in New York City, will buy 100% wind power from Texas-based Green Mountain Energy Company. "It was a natural fit for us to combine 100% clean energy with our nearly completed, groundbreaking energy efficiency retrofit work," Anthony E. Malkin, president of Malkin Holdings, which runs the building, said in the announcement. "Clean energy and our nearly 40% reduced consumption of watts gives us a competitive advantage in attracting the best credit tenants at the best rents." The two-year contract for 55 million kilowatt hours of renewable energy annually will prevent nearly 100 million pounds of carbon dioxide emissions each year, according to Green Mountain. The company estimates the CO2 reduction is the equivalent of nearly every house in New York state turning off their lights for a week or planting nearly 150,000 trees—more than six times the number in Central Park. As part of its green retrofit, the Empire State Building has hired Serious Materials to remove, retrofit and replace each of its 6,514 double-hung, dual-pane windows. It"s also adding insulation and other upgrades. 注释: (1)the Empire State美国纽约帝国大厦 (2)decade n. 十年 (3)combine...with与……结合 (4)groundbreaking复合形容词,前所未有的 (5)retrofit n. 改装,修缮 (6)holdings也可以为holding company,控股公司 (7)consumption n. 动词形式consume,消费,消耗 (8)renewable a. 由词根new加前缀re-,renew更新,再生,加后缀-able有被动意,即可再生的。renewable energy可再生能源 (9)carbon dioxide二氧化碳 (10)emission n. 排放emit v. 排放 (11)equivalent n. 等量 (12)insulation n. 绝热,绝缘insulate v. ~from使……与……隔离

查看答案
更多问题

在开展项目前期评估选择中介服务机构时,有实力主要考核______。

A. 专家层次
B. 资格等级
C. 组织管理能力
D. 装备水平
E. 咨询专业

下列市场调查程序中,正确的顺序是______。

A. 调查准备、调查实施、分析总结
B. 调查准备、调查分析、调查实施
C. 调查准备、调查实施、调查调整
D. 调查准备、调查评价、调查实施

关于项目决策程序的说法,正确的有______。

A. 小型外商投资项目应向政府主管部门备案
B. 大型项目的可行性研究报告应报政府审批
C. 实行核准制的项目应同时向政府递交资金申请报告
D. 企业内部审批决策是项目决策程序中的重要一环
E. 项目申请报告应由具备相应资格的工程咨询机构编制

消费调查要对消费层次、消费需求、消费动机、消费方式等进行调查和分析,一般应在______之后进行。

A. 市场预测得出消费量
B. 市场细分明确了消费者
C. 市场分析提出市场战略
D. 市场调查明确消费市场占有率

答案查题题库