题目内容

Interest is steadily spreading from a minority of enthusiasts in developing renewable sources of energy--wind, wave and solar power, tidal and geothermal energy. Additional support for them has come with a proposal to explore the untapped sources of hydro-electric power in Scotland. The details are provided by Mr. William Manser in a study provided for an expert committee to look at the developments possible for hydro-electric sites and, more important, for means of financing them. There is a clear industrial connection in Mr. Manser’s study because it was done for the Federation of Civil Engineering Contractors; hydro-electric schemes, by definition, have a large civil engineering component in them. Mr. Manser estimates that wind power could theoretically provide more than 7 percent of electricity supply in the United Kingdom, provided suitable sites for generators could be found. However, the practical viability of wind power generation is not likely to be understood until 1990. Other developments using renewable energy sources are also at an early stage as far as their commercial possibilities are concerned, he believe. The best developed and most suitable form of renewable energy is, in his view, hydro power. The technology has been developed over centuries and is still progressing. At present it is the cheapest form of electricity generation. Mr. Manser studied past surveys of the north of Scotland and identified several as suitable for hydro-electric generation. Those are in the remote areas, usually of great natural beauty. But Mr. Manser says a well-designed dam can be impressive in itself. It is also possible to make installation as unobtrusive as possible, to the point of burying parts of them. Hydro generation involves no water pollution, smoke creation or unsightly stocking-out yards. The main trouble, which appears from his report, is financing an undertaking which has a heavy initial capital cost, and very low running costs. However, Mr. Manser does not see that as an unfamiliar position for the electricity industry. He cites the proposed construction of the new nuclear power station at Sizewell in Suffolk, which will have a high initial capital cost. The argument at Sizewell that the reason for the expenditure is that the capital will provide a benefit in lower costs and higher returns in the long-term, applies equally to hydro-electric generation. In Mr. Manser’s opinion, the main stumbling block to the development of hydro-electric power is the

A. [A] capital outlay.
B. running cost.
C. public expenditure.
D. financing risk.

查看答案
更多问题

Questions 14 to 17 are based on the following interview with Tom Kenney, the managing editor for multimedia at Washingtonpost Newsweek Interactive about WashingtonPost. com. You now have 20 seconds to read Questions 14 to 17. What aspect of WashingtonPost. com has been depreciated

A. [A] Narrative storytelling.
B. Visual and editing technique.
C. Documentary photography.
D. Time and attention of audience.

Some people have returned home despite the possible danger.

A. 对
B. 错

In 1991 Philippines witnessed the second largest volcanic eruption that hit an area with large population.

A. 对
B. 错

Questions 11~13 are based on the following talk. You now have 15 seconds to read Questions 11~13. What will happen to the programs of television of the future

A. [A] All TV sets can receive some programs without paying money in a certain area.
B. [B] You may pay for some special programs if you like.
C. [C] If you are interested in a certain subject, you may borrow some video tapes about it.
D. [D] All of the above.

答案查题题库