A. alert(newDate(2011,12,25).getDay()); B. alert(newDate(2011,12,25,5).getDay()); C. alert(newDate(2011,12,25,5,5,9).getDay()); D. 以上三个结果都正确
A. 1,2,3 B. 1,2,3,4 C. 2,3,4 D. 2,3,4,5
A. 0% B. 5% C. 20% D. 25%
A. C. D.
A. 0.5m B. 1.0m C. 1.5m D. 2.0m