The following item is NOT an element for the establishment of differing site conditions (DSC).
A. Two parts of the conditions in the same site are substantially different.
B. The contract documents must have indicated a physical condition.
C. Actual conditions are materially different from what is stipulated in the contract.
查看答案
Which of the following is NOT the reason for denying differing site condition claims?
A. Lack of notice
B. Difference is not material
C. High turnover rate of construction crews
D. Failure to conduct an adequate pre-bid site inspection
Which of the following item is INCORRECT?
A. In the US, construction safety performance largely improved after 2001.
B. OSHA requires the employers to keep / preserve fatality / accident records.
Currently, site inspection performed by OSHA should be accompanied with the employers or its representative.
Which of the following item is INCORRECT?
A. FIDIC Redbook 2017 requires that the contractor shall submit to the Engineer for information a health and safety manual.
B. Non-conformance of safety code can be regarded as breach of a contract (if provisions are available).
C. “Whistle-blower” provisions require employers’ duty of quality audit.
D. In general, the contract should reflect that the owner is eligible to perform safety inspections.
Regarding insurance and bond, which of the following item(s) is/are correct?
A. The concept of “obligee” and “principal” are the entities involved in an insurance agreement.
B. Insurance echoes to the occurrence of an accident.
C. Indemnitors will pay the surety back for any losses that the surety incurs.
D. Bonds echoes to some kind of alleged failure of the principal to perform.