What percentage of the total distribution are 1 sigma from the mean equal to
A. 68.8 %0
B. 99.9%
C. 95.5
D. 99.7%
查看答案
The project team uses various tools during project planning. To determine the primary cause of problems within a process, the team would use ______.
A. flowcharting
B. cost/benefit considerations
C. benchmarking
D. variable experiments
The benefits of a quality control program include ______.
A. reduced short term costs
B. increased long term costs
C. able to make acceptance decisions
D. a loss in competitiveness
Due to lack of employee training and proper production controls, defects in a production run caused rework which cost the company $ 250000. How much of this cost is directly attributable to the employees on the production line
A. $75OOO
B. $37500
C. $212500
D. $145OO
The "zero defects" concept was proposed by ______
A. Juan
B. Crosby
C. Deming
D. Taguchi