题目内容

体温过低见于

A. 急性大出血
B. 感染
C. 恶性肿瘤
D. 免疫性疾病
E. 无菌性组织坏死

查看答案
更多问题

三凹征是指患者吸气时出现

A. 胸骨上窝、胸骨下窝、肋间隙凹陷
B. 胸骨上窝、锁骨上窝、肋间隙凹陷
C. 锁骨上窝、锁骨下窝、胸骨角凹陷
D. 胸骨上窝、锁骨下窝、肋间隙凹陷
E. 锁骨上窝、胸骨下窝、肋间隙凹陷

速脉见于

A. 贫血
B. 黄疸
C. 甲状腺功能减退症
D. 病态窦房结综合征
E. 主动脉瓣关闭不全

The World"s Longest BridgeRumor has it that a legendary six-headed monster lurks in the deep waters of the Tyrrhenian Sea between Italy and the island of Sicily. 1 When completed in 2010, the world"s longest bridge will weigh nearly 300,000 tons—equivalent to the iceberg that sank the Titanic—and stretch 5 kilometers long. "That"s nearly 50 percent longer than any other bridge ever built." says structural engineer Shane Rixon. 2 They"re suspension bridges, massive structures built to span vast water channels or gorges. A suspension bridge needs just two towers to shoulder the structure"s mammoth weight, thanks to hefty supporting cables slung between the towers and anchored firmly in deep pools of cement at each end of the bridge. The Messina Strait Bridge will have two 54,100-ton towers, which will support most of the bridge"s load. The beefy cables of the bridge, each 1.2 meter in diameter, will hold up the longest and widest bridge deck ever built.When construction begins on the Messina Strait Bridge in 2005, the first job will be to erect two 370 meter-tall steel towers. 3 Getting these cables up will be something. It"s not just their length—totally 5.3 kilometers—but their weight. 4 After lowering vertical "suspender" cables from the main cables, builders will erect a 60 meter-wide 54,630-ton steel roadway, or deck—wide enough to accommodate 12 lanes of traffic. The deck"s weight will pull down on the cables with a force of 70,500 tons. In return, the cables yank up against their firmly rooted anchors with a force of 139,000 tons—equivalent to the weight of about 100,000 cars. Those anchors are essential. 5 A. Some environmentalists are against the project on biological grounds.B. What do the world"s longest bridges have in commonC. If true, one day you might spy the beast while zipping (呼啸而过) across the Messina Strait Bridge.D. They"re what will keep the bridge from going anywhere.E. The second job will be to pull two sets of steel cables across the strait, each set being a bundle of 44,352 individual steel wires.F. They will tip up the scales at 166,500 tons—more than half the bridge"s total mass.

代谢性酸中毒患者会出现

A. 间停呼吸
B. 潮氏呼吸
C. 呼吸浅快
D. 库氏呼吸
E. 呼吸浅慢

答案查题题库