题目内容

[背景]通过检查分析,如果发现原有进度计划已不能适应实际情况时,为了确保进度控制目标的实现或需要确定新的计划目标,就必须对原有进度计划进行调整,以形成新的进度计划,作为进度控制的新依据。[问题]1.施工进度计划调整的具体方法有哪两种?2.通过缩短网络计划中关键线路上工作的持续时间来缩短工期的具体措施有哪几种? 具体做法是什么?

查看答案
更多问题

After the birth of my second child, I got a job at a restaurant. Having worked with an experienced (36) for a few days, I was (37) to wait tables on my own. All went (38) that first week. When Saturday night came, I was luckily (39) the tables not far from the kitchen. (40) , I still felt it a little hard to carry the heavy trays (托盘).Before I knew it, the (41) was full of people. I moved slowly, (42) every step. I remember how (43) I was when I saw the tray stand near the tables. It looked different from the one I was (44) on. It had nice handles, which made it (45) to move around. I was (46) with everything and began to (47) I was a natural at this job.Then an old man came to me and (48) , "Excuse me, dear, my wife and I loved (49) you work. It seems your tray stand has been very (50) to you, but we are getting ready to (51) now, and my wife needs her (52) back."At first his (53) did not get across. Then, I got it. I had set my trays on his wife’s orthopedic walker (助听器). My face was (54) . I wanted to get into a hole and (55) . 38().

A. well
B. quickly
C. safely
D. wrong

In most countries the selection of a landfill site is governed by rules and regulations.

I was out of town at the time, so I do not know exactly how it ______.

A. was happening
B.happened
C. happens
D.has happened

To dispose of a ton of trash in a landfill, customers have to pay a tipping fee of______.

答案查题题库