题目内容

A bond is needed when the bill of lading cannot be availed of the time of entry of the im- ported commodities. What does the sentence mean

A bond is needed when the bill of lading is unavailable when the goods arrive at the destination.
B. A bond is needed when the bill of lading arrives at the port of destination.
C. A bond is not needed when the goods arrive at the destination.
D. A bond is needed when the goods arrive at the destination if there is no bill of lading at all.

查看答案
更多问题

起重机装在铁道货车上,运行在铁道上( )A.34B.35C.36D.37

某教学楼平面布置如题图,采用装配式钢筋混凝土楼(屋)盖,外墙均为370mm墙,隔墙为120mm,其余均为240mm墙。底层墙高4.2m(算至基础顶),M5砂浆砌筑,隔墙墙高3.5m,用M2.5砂浆砌筑。 该教学楼的C轴上③~⑤轴问墙的高厚比和允许高厚比与下列()项数值最为接近。

A. 15.6;22
B. 17.5;21
C. 17.5;26
D. 12.3;23.6

我国按CIF条件向南美出口商品2000箱,货物装船前,卖方已办理了投保手续。货轮航行途中,因绕航到其他港口装货,致使货轮航行了三个月才到达目的港。货到目的港后,该批商品的市场行情已发生变化,买方遂以不可抗力条款为由拒绝付款,买方的做法是正确的。( )

A. 对
B. 错

可变电容器( )A.20B.22C.21D.24

答案查题题库