题目内容

When planning the loading or discharging of a VLCC(100,000 DWT+)what is the most important

A. Draft and trim
B. Limits of the bending moments
C. Rate of discharging
D. Rate of loading

查看答案
更多问题

When taking soundings on a ship,coating the tape with chalk helps to ______.

A. Better identify the correct reading
B. Show the depth of any water in an oil tank
C. Make the tape roll easier
D. Reduce possibility of sparks

When loading a tanker,you should ______.

A. load only one tank at a time
B. keep the seamen on watch on standby in the mess room
C. keep a strain on the loading hoses
D. close valves by closing them down,reopening one or two turns,and re-closing

When referring to quantity of barite in a P-tank,ullage is the ______.

A. Distance of the barite surface above the tank bottom
B. Percentage of barite in the tank
C. Distance of the barite surface below the tank cover
D. Total weight of barite in UPC(ullages per centimeter)

When bunkering is complete,the hoses should be ______.

A. Cleaned internally with a degreaser
B. Washed out with hot soapy water
C. Drained,blanked off,and stored securely
D. Stowed vertically and allowed to drain

答案查题题库