在施工过程中,发包人没有为承包人提供合同约定的施工条件、未能按照合同约定的期限和数额付款,这种索赔原因可归结为( )。
A. 不利的物质条件
B. 合同缺陷
C. 合同约定
D. 当事人违约
查看答案
下列窗体中不可以自动创建的是( )。
A. 纵栏式窗体
B. 数据访问表窗体
C. 图表窗体
D. 主/子窗体
Which of the following is NOT included in the qualifications required for the position
An ability to operate computer well
B. Good written English skills
C. A university degree in journalism, communications, English or other related field
D. An ability to work under deadline pressure
Which of the following occurred before Raju went to sleep
A. He felt uncomfortable to lie on the mat prepared by his mother and complained that there was something itching.
B. After he lay down to sleep he wanted his mother to move as close to him as possible.
C. He learned a lot about the legendary hero Devaka from the story which his mother told him before he went to sleep.
D. His father returned soon after he and his mother fell asleep.
What does the passage mainly discuss
A. Why we measure time the way we do.
B. Ways of measuring time.
C. The development of universal time.
D. How time is measure