Section A Directions: This section is to test your ability to understand short dialogues. There are 5 recorded dialogues in it. After each dialogue, there is a recorded question. Both the dialogues and questions will be spoken only once. When you hear a question, you should decide on the correct answer from the 4 choices marked A), B), C) and D) given in your test paper Then you should mark the corresponding letter on the Answer Sheet with a single line through the center. What can we learn about the woman?()
A. She is now in Shanghai.
B. She wishes she were in Shanghai now.
C. She is now in Japan.
D. She wishes she were in Japan now.
查看答案
(二) 某地新建一水库,其库容为3亿立方米,土石坝坝高75m。批准项目概算中的土坝工程概算为1亿元。土坝工程施工招标工作实际完成情况如表8-2。 表8-2 土坝工程施工招标工作实际完成情况表 工作序号 (一) (二) (三) (四) (五) 时间 2006.5.25 2006.6.5~9(5个工作日) 2006.6.10 2006.6.11 2006.6.27 工作内容 在《中国采购与招标网》上发布招标公告 发售招标文件,投标人A、B、C、D、E购买了招标文件 仅组织投标人A、B、C踏勘现场 电话通知删除招标文件中坝前护坡内容 上午9:00投标截止:上午10:00组织开标,投标人A、B、C、D、E参加 根据《水利水电土建工程施工合同条件》(GF—2000—0208),发包人与投标人A签订施工合同。其中第一坝段土方填筑工程合同单价中的直接费为7.5元/m3(不含碾压,下同)。列入合同文件的投标辅助资料有如下内容(见表8-3)。 表8-3 列入合同文件的投标辅助资料表 填筑方法 土的级别 运距(m) 直接费(元/时) 说明 2.75m3铲运机 Ⅲ 300 5.3 1.单价-二直接费×综合系数,综合系数取1.34 2.土的级别调整时,单价须调整,调整系数为:Ⅰ、Ⅱ类土0.91,Ⅳ类土1.09 Ⅲ 400 6.4 Ⅲ 500 7.5 1m3挖掘机配 5T自卸汽车 Ⅲ 1000 8.7 Ⅲ 2000 10.8 工程开工后,发包人变更了招标文件中拟定的第一坝段取土区。新取土区的土质为黏土,自然湿密度1900kg/m3,用锹开挖时需用力加脚踩。取土区变更后,施工运距由500m增加到1500m。 [问题] 根据现行水利工程设计概(估)算编制的有关规定,指出投标辅助资料“说明”栏中“综合系数”综合了哪些费用
What is the man’s name?()
A. Peter Jones.
B. Nick Johnson.
C. Bill Jackson.
D. Mike Jason.
During the journey be (mislead) ______ by a guide.
What can we know about Mr. Strong?()
A. He is not in.
B. He is on another line.
C. He can’t come to the telephone.
D. He doesn’t want to answer the call.