______ is a combination carrier.
A. OBO
B. Crude oil tanker
Container carrier
D. Bulker
The person in charge on the vessel and the person in charge at the facility must hold a meeting before starting the transfer of oil.Who must decide to start the transfer ________.
A. The person in charge on the vessel
B. The person in charge at the facility
C. Both persons in charge
D. The person in charge of either place that is doing the pumping
To allow for the rise or fall in tide and for change in draft of a tanker during cargo transfer,cargo hoses must be suspended with ______.
A. Slings or saddles placed at 25-foot(8 meter)intervals
B. Enough slack in their bight
C. Topping lifts and runners tied off to winches
D. All of the above
The transfer procedures required to be followed on tankers shall contain ______.
A list of each port of discharge
B. A line diagram of the vessel's transfer piping
C. A current crew list
D. The duties by name of each person in charge required for each transfer operation