● 在一个具有n个顶点的无向图中,要连通全部顶点至少需要 ()条边。()A.n B.n+l C. n一1 D. n/2
查看答案
● A project manager believes that modifying the scope of the project may provide added value service for the customer .The project manager should()()A. assign change tasks to project membersB. call a meeting of the configuration control boardC. change the scope baselineD. postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline
●早期的微机,普遍采用ISA总线,它适合 (1)位字长的数据处理。为了适应增加字长和扩大寻址空间的需要,出现了 (2)总线,它与ISA总线兼容。
(1)A.64 B.16 C.24 D.32
(2)A.STD B.PCI C.EISA D.VESA
● A hard disk (()) much greater storage capacity than a floppy disk.()A. provides B.grasp C.surport D.modify
●In the ISO 9126, there are six key software quality properties, including functionality,