题目内容

First, the owner looks for the architect-engineer performing their design. Second, the owner delivers the drawings (when available) to the general contractor. Thirdly, the general contractor performs the construction work accordingly. This project costs less than 5,000 USD and less than three months. Which one of the FIDIC contract templates would be the most suitable for this particular job?

A. “Yellow Book”
B. “Silver Book”
C. “Green Book”
DBO contract

查看答案
更多问题

Which of the following is an open specification?

A. The initial flow rate of the kitchen ventilator should be set at more than 60 L/ min …
B. The kitchen ventilator should be made by Haier

Which of the following item is required FIRST for the cost of lump-sum estimating?

A. Indirect costs
B. Equipment
C. Material (Quantity takeoff )
D. Markup

Which of the following item is NOT directly related to bid ethics?

A. Bid Shopping
B. Increase sub-bid quotes to GC after the award of prime bid
C. Inflation
D. Bid Rigging

Which of the following description is correct?

A. The definition of “principal structure” is unclear in China.
B. Parties in item JV participate in common profits or losses.
Chinese Law regulates that GC may subcontract part of its work without consent of the owner.