题目内容

简述监理工程师在开工后施工阶段的主要监理工作内容。

查看答案
更多问题

German Chancellor Angela Merkel won over German voters in the Federal Election on Sept. 27. Can she now be won over by a French charm offensive (1) at repairing the relationship that was once at the heart of Europe That’s the question being asked in Paris, (2) top government officials are (3) talking about their desire to rekindle closer ties (4) their neighbors across the Rhine. (5) the end of World War II the Franco-German relationship has been the motor of European integration, the (6) force behind the creation of the European Union and, more recently, the introduction of the euro. But the ardor has (7) in this decade, particularly under Merkel, who has regularly struggled to (8) her irritation with French President Nicolas Sarkozy’s grandstanding. Sarkozy, (9) , has often been impatient with what he (10) Merkel’s lack of resolve.The sometimes (11) personal rapport is a long way from the public shows of affection their predecessors staged, particularly Helmut Kohl and FranCois Mitterrand, who movingly held (12) in 1984 in a Verdun cemetery. There’s been tension on (13) , too. Charles Grant, director of the London-based think tank Centre for European Reform, points out that France and Germany have been (14) on issues from how best to reflate their economies during the economic (15) to the smartest strategies for dealing with Russia.But influential movers in France are now (16) to put the relationship back on a friendlier footing. In a recent paper French think tank Institute Montaigne (17) an ambitious agenda for the two nations, (18) that a new impetus is needed if Europe’s voice is to be heard in a world (19) of big new players, such as Brazil and India, and at a time when President Obama seems fax more (20) with China and the rest of Asia than with America’s traditional allies in Europe. Read the following text. Choose the best word (s) for each numbered blank and mark A, B, C or D on ANSWER SHEET 1.7()

A. deteriorated
B. aggravated
C. moderated
D. cooled

根据合同有关规定,业主或承包人应通过监理工程师向对方索取合同价格以外的费用。

A. 对
B. 错

(三) 某电梯安装工程项目,由于电梯工程在高且深的井道内作业,每层在层门安装前留下较大的门洞,这对作业人员或其他闲杂人员存在高空坠落的危险,针对这一情况,施工项目经理部对从事影响工程质量的所有人员进行了控制。 施工项目经理部对该电梯工程的施工程序和施工安全技术措施的制订如下: (1)机房通向井道的预留孔随时开通以方便施工。 (2)井道安装好导轨后放基准线进行配管配线。 (3)层门洞靠井道壁外侧设置坚固的围封,围封的高度不小于0.8m。 (4)由制造厂组装完成经调试合格后加以封记的机电协调动作部件在施工时应拆封调整后安装。 (5)电梯安装单位安装完毕自检试运行结束后,由监理单位负责进行校验和调试。 (6)电梯经校验和调试符合要求后,向当地特种设备安全监督部门报验要求监督检验。 问题 施工项目经理部对施工人员主要从哪些环节进行控制

监理工程师代表业主对施工质量实施监理并对施工质量承担监理责任。

A. 对
B. 错

答案查题题库