Which of the following faults is an SYMMETRICAL or BALANCED fault? ( )
A. Phase to ground
B. Three phase to ground
C. Phase to phase
Double phase to ground
查看答案
Before a generator can be connected to the infinite bus or with another running generator, the incoming generator and the infinite bus (or running generator) must be synchronized, they must have the same( )。
A. Voltage
B. Frequency
C. Phase sequence
D. Phase angle
A synchronous generator has a synchronous speed of 1000rpm and 6 poles. The frequency of the generator is ( ) 。
A. 45Hz
B. 50Hz
C. 60Hz
The symbol and units of measurement for ACTIVE power are ( )。
A. S, W
B. Q, VA
C. P, VA
D. P, W
The long line model of a transmission line should be used when( )。
A. Line length less than 80 km.
B. Line length between 80 km and 250 km.
C. Line length longer than 250 km.